According to the process flow of the color coating line, the prepared coated coil should be inspected for appearance and surface.
According to the specifications of the substrate, the inlet section tension value should be set, and the pre-coated substrate should be recorded (number, gross weight, net weight, thickness, width, date of manufacture), ready to go on the machine, use the crane to hoist the material to the V-shaped bracket, pay attention to the direction of unwinding, start the hydraulic station, jog the loading trolley, press the plate according to the specifications of the plate, open the shrinking cylinder, lift the auxiliary support, the trolley Return to the original place, send the head to the pinch roller, clamp and send it to the shearing machine to the riveting machine.
After riveting the substrate, prepare the car before starting. When starting the car, check the quality of the board at all times. Notify the next process and do all the records in this paragraph.